Project: S-21   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Kent Ingram   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

May 18, 2023     Manifold pressure line to ignition - (1 hour)       Category: Engine
Decided on a route from engine side of firewall to the LSE ignition modules inside of cabin. Particularly driven by where I had access with a drill. Routed line after drilling the access hole. Still need to get a 1/8” npt to 1/8” hose barb fitting.

Also pulled out Titan factory oil drain plug and replaced with a quick drain plug supplied with the RANS kit.

Tried several different routings for the sleeved fuel line that goes from the fuel injection servo to the flow divider on top of the engine. I was able to adjust the clocking on the outlet fitting on the servo and then route the hose well away from exhaust components.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.